Drill-and-Blast Tunnel Cost Estimator
by Theseus Workshop
$44.50
Estimate Drill-and-Blast Tunnel Excavation Quantities, Resource Requirements, BOQs & Tender Costs from Geometry and Cycle Assumptions. Test how engineering and production inputs change the estimated cost of tunnel works.
Are you pricing a tunnel by its length while overlooking the construction cycles, equipment hours, and material consumption that actually determine your project cost?
A 1,000-metre tunnel does not have a fixed production cost. Changes in blast pull length, geological overbreak, drilling requirements, and ground support assumptions can significantly change the resources required to complete the excavation.
If labour, materials, equipment, and commercial allowances are estimated independently, critical cost exposures can remain hidden until after the tender is submitted.
Build your tunnel estimate around the actual construction cycle — not disconnected cost assumptions.
This Excel-based Drill-and-Blast Cost Estimation Toolkit connects tunnel geometry and engineering assumptions to resource consumption, material BOQ quantities, and commercial tender costs.
What You Can Calculate & Control
Excavation & Blast Cycles: Calculate excavation volumes, overbreak allowances, and total blast rounds based on tunnel length and pull length.
Drilling & Explosives: Estimate jumbo drilling metres, drill consumable wear, ANFO/emulsion consumption, and detonator requirements.
NATM Ground Support: Calculate shotcrete volumes, rock bolt quantities, and steel arch requirements.
Equipment & Labour: Translate construction cycles into equipment operating hours and underground crew labour requirements.
Material BOQ: Connect calculated quantities to centralized supplier price databases.
Commercial Cost Analysis: Separate material, labour, equipment, direct costs, site overhead, contingency, and profit margin.
Why This Matters Commercially
A shorter blast pull can increase the number of construction cycles, driving additional drilling, detonator, equipment, and labour requirements.
Meanwhile, overbreak increases excavation quantities and can create additional mucking and ground-support costs.
By connecting these assumptions in one calculation workflow, you can evaluate their downstream cost implications before finalizing your tender.
A Reusable Estimating Framework
Seven-sheet Excel workbook with structured inputs, rate databases, calculation engine, BOQ, and cost summary.
Native Excel formulas with dynamic lookups.
100% No-VBA architecture.
Microsoft Excel 365 with Dynamic Array support.
Reusable supplier rates and resource configurations for future estimates.
Designed For: Tunnel contractors, hard-rock mining estimators, quantity surveyors, infrastructure commercial managers, and underground construction planners.
Important: This is a commercial estimating and BOQ calculation tool, not an engineering design authority. Project-specific geotechnical investigations, blast designs, and ground-support decisions must be established and reviewed by qualified professionals.
Stop rebuilding tunnel estimates from disconnected spreadsheets. Build a traceable cost model around your actual construction assumptions.
Get the Excel Toolkit and standardize your next underground construction estimate.
Preview in Google Sheet
Note on Compatibility: The Google Sheets preview may display occasional #NAME? errors or formula warnings due to differences between Google Sheets and Microsoft Excel formula compatibility. These are preview-only compatibility issues and do not affect the functionality of the original Excel workbook. For the intended formula behavior and full functionality, please download and open the .xlsx file in Microsoft Excel.
What Happens After You Buy?
Instant Access: Your download is ready the second your payment clears. You will be redirected to the secure Gumroad download page immediately.
Lifetime Access & Updates: Lose the file? Change computers? No problem. You can re-download the toolkit at any time via your original Gumroad link or purchase history. All future version updates and bug fixes are yours for life, and will be automatically pushed directly to your purchasing email.
Easy Maintenance : The embedded logic handles data cleaning, exception checking, and recalculations automatically. This structured workflow leaves the high-value work to you: reviewing the results, investigating anomalies, and making informed business decisions.
The "No-Ghosting" Refund & Support Guarantee
Most digital templates leave you on your own after the transaction clears. This toolkit is built by an industry professional to replace repetitive spreadsheet work, and it comes with real accountability.
If you open the bundle, input your data, and realize it fundamentally clashes with your business model, you have two options:
Workflow Support: Contact me at 👉support@theseusworkshop.com. I will review where the disconnect is and provide full support for bug fixes and core functionality questions. (Note: Extensive structural customization for your specific company is available as a separate consulting service).
100% Hassle-Free Refunds. Not satisfied? Simply reply to your receipt email. You are entitled to a full 30-day refundI will process a full refund within 24 hours—no questions asked, and no explanation needed.
Updates & Maintenance Your purchase includes free access to any future bug fixes or minor updates to this version of the toolkit. Set up the framework once, maintain your commercial rates, and reuse the workflow project after project.
License: Copyright © Theseus Workshop. For personal and internal business use only. Your data remains strictly local. Reselling, sharing, reproducing, or modifying for commercial redistribution is strictly prohibited.
Complete Your Workflow
Add Construction Project Cost & Cash Flow Controller to track live tunnel costs, variations, progress claims, and cash exposure once excavation begins.
Unexpected ground conditions can blow past a tender estimate fast if variations and claims lag behind. Pick up the project controller at 20% off today to keep live site spend tied to your tunnel baseline.